Hours: Mon - Fri: 8am – 6pm
0

No products in the cart.

Off-Grid System
Installed 3Kw off grid system with Beta Energies inverter
Installed 3Kw off-grid system with Beta Energies inverter Installed 3Kw off-grid system with Beta Energies inverter, Beta 12V/200A @ 2 batteries,at Maharagama. Already Installed 20Kw on the grid solar system two years back. View more projects
Read More
Installed 5Kva off grid solar system at Kesbewa
Installed 5Kva off-grid solar system at Kesbewa View more projects
Read More
Installed 5.5KW off grid solar system at Dr Anil’s
Installed 5.5KW off-grid solar system at Dr. Anil’s Battaramulla residence Installed a 5.5KW off-grid solar system at Dr. Anil’s Battaramulla residence. 5 5KW inverter, JA 460W @ 8nos, Beta solar batteries 100A @ 4nos. This stand-alone system will supply power throughout day time, without a CEB supply. View more projects
Read More
Installed 5.5KW two off grid solar systems
Installed 5.5KW two off-grid solar systems Installed 5.5KW two off-grid solar systems at Collage Of Surgeons Auditorium & Office. Thanks Dr Shatish, Dr Kavinda, Dr Mahendra…. (President, Secretary, Committee member of the society of Surgeons)for giving this opportunity to DP ENERGY. View more projects
Read More
Installed & commissioned 5000VA off grid
Installed & commissioned 5000VA off grid Installed & commissioned 5000VA off-grid system with panels & 12V/ 100A four batteries at Malabe residence. Refrigerators, AC & all electrical equipment can be used for five to six hours during power failures. View more projects
Read More
Installed & commissioned 3000VA off grid
Installed & commissioned 3000VA off grid Installed & commissioned 3000VA off-grid system with 12V/ 100A two batteries at Mr. Madawa Deshapriya, (Director – Foreign Employment Buero) at his Habarakada residence. Refrigerators, AC & all electrical equipments can be used for five to six hours during power failures. View more projects
Read More
Installed & commissioned 3000VA off grid system
5 KW Rooftop Solar System at Thalawatugoda Installed & commisioned 3000VA off grid system with REC 400W two panels & 12V/ 100A two Gell batteries at Talawatugoda. Refrigerator, AC & all electrical equipments can be used for five to six hours during power failures. Existing on grid 8KW European solar system also installed by DP...
Read More
Installed & commissioned 3000VA off grid system
Installed & commissioned 3000VA off-grid system Installed & commissioned 3000VA off-grid system with REC 400W two panels & 12V/ 100A two Gell batteries at Sisira Senaratne, (GM – Heritance Ahungalla) at his Jaela residence. Refrigerators, AC & all electrical equipment can be used for five to six hours during power failures. View more projects
Read More
1000VA off grid system installed at Hokandara.
1000VA off grid system installed at Hokandara View more projects
Read More
5000VA off grid system installed at Aturugiriya
5000VA off grid system installed at Aturugiriya 5000VA off grid system installed at Aturugiriya. Refrigerator, Air Conditioner & other all electrical appliances can be used for six, seven hours during power failure. View more projects
Read More
en_USEnglish